Here is a link for those new with ideas to see where I'm coming from. viewtopic.php?f=6&t=10342
Before winter hit I got the secondary mobile fully leveled and safe for winter. Now it's time to get serious on my below frost line footings. The plan is to remove my piers and let the mobile rest back on the wheels. While it is resting on the wheels I will space my piers 8 feet apart and dig down 4 feet into the earth. ( Now the question is what is the best way to dig whilst under a mobile. I have enough room to sit up or kneel under this house but a shovel will be incredibly difficult. I could take a post hole digger and cut the handles down, but digging into clay will be insanely difficult. Any tips would be awesome.)
Over the winter I tore the entire kitchen apart and spent some time drawing up remodel plans. I've been purchasing smart siding throughout the winter and currently have 17 of the 43 total sheets I need. I will be picking up cement bags to do my footers here in the next week or so and will start digging as soon as I can figure out how.
![Very Happy :D](./images/smilies/icon_biggrin.gif)
I have my roof over figured out with a cost of $3000 dollars doing all the work myself. The roof will have to be done before the siding as I don't want water running down my new siding. However the roof has to wait until after the piers which will be undoubtedly the hardest part of the job.
I hope to have updates much more frequently in the near future for those who have interest to see how we are making out.
Thank you for reading and have a great night.